Gisborne & Hawkes Bay

Planned Work Report 3 - 10 May 2024

Please find below work planned for next week, weather permitting. The asphalting night works schedule is also advised below. Inclement weather will cause delays – work can only be completed in dry conditions so the programme is subject to change. As always, the NZTA Journey Planner will have the most up to date information. Detour routes for all vehicles, including heavy vehicles and HPMVs, will be in place.

State Highway 35

Road

Section

Indicative Date

Traffic Management

Possible Delays

SH35 Waiapu Rd, Mangahauini

Between Te Wehi Rd and Puketiti Rd – bridge, river wall and long drop repairs

6-10 May

Stop/Go

Up to 5 minutes

SH35 Waiapu Rd, Waipiro Bay

Between Ihungia Rd and Kopuaroa Rd – slip repairs

6-10 May

Stop/Go

Up to 5 minutes

SH35 Waiapu Rd, Te Puia

Between Te Wehi Rd and Puketiti Rd – construction of a slow vehicle bay extension

Approx 3 months until May

Stop/Go

Up to 10 minutes

SH35 Waiapu Rd, Mangatuna

Between Arero Rd and Anaura Rd – drainage repairs and stabilising

6-10 May

Stop/Go

5-10 minutes

SH35 Waiapu Rd, Hikuwai

Between Anaura Rd and Matairau Rd – culvert

repairs

6-10 May

Stop/Go

Up to 5 minutes

SH35 Waiapu Rd, Busby’s Hill

Between Mata Rd and Kaiawha Rd – pavement repairs

6-10 May

Stop/Go

Up to 5 minutes

SH35 Waiapu Rd, Tolaga Bay

Between Tolaga Gorge and Waihau Rd – pavement repairs

6-10 May

Stop/Go

5-10 minutes

SH35 Te Araroa Rd, Tikitiki

Between Pepere Rd and Herupara Rd – pavement repairs

6-10 May

Stop/Go

Up to 5 minutes

SH35 Waiapu Rd, Tolaga Bay

Between Solander St and Kopuatarakihi Rd – pavement repairs

6-10 May

Stop/Go

5-10 minutes

SH35 Waiapu Rd, Tokomaru Bay

Between Waipiro Rd and Te Wehi Rd – kerb replacement

6-10 May

Stop/Go

5-10 minutes

State Highway 2

SH2 Wharerata Rd, Muriwai

Between Coop Rd and Williams Rd – bridge and culvert repairs

6-10 May

Stop/Go

Up to 5 minutes

SH2 Matawai Rd, Matawai Village

Between Motu Rd and Raumati St – kerb replacement

6-10 May

Stop/Go

5-10 minutes

SH2 Matawai Rd, Ormond

Between Pitcher Rd and Bond Rd – upgrade kerb and channelling

6-10 May

Stop/Go

5-10 minutes

SH2 Waioeka Rd, Te Wera

Between Te Wera Rd and Waioeka Gorge – kerb and channel clearing

6-10 May

Stop/Go

5-10 minutes

Sh2 Matawai Rd, Waerengahika

Between Back Ormond Rd and Makaraka Village – kerb and channel clearing

6-10 May

Stop/Go

5-10 minutes

SH2 Wharerata Rd, Manutuke

Between Bells Rd and Papatu Rd – kerb and channel clearing

6-10 May

Stop/Go

Up to 5 minutes

SH2 Wharerata Rd, Maraetaha

Between Maraetaha Rd North and Maraetaha Rd South – extension of road shoulder

Approx 3 months until May

Stop/Go

5-10 minutes

SH2 Matawai Rd, Otoko

Between Hihiroroa Rd and Fitzgerald Rd – soil testing

8 May

Stop/Go

Up to 5 minutes

SH2 Matawai Rd, Puha

Between Whakarau Rd and Waihuka Rd – bridge repairs

6-10 May

Stop/Go

Up to 5 minutes

SH2 Matawai Rd, Otoko

Between Hihiroroa Rd and Fitzgerald Rd – underslip repairs

6-10 May

Stop/Go

5-10 minutes

PROPOSED ASPHALTING PROGRAMME

Time

Location

Traffic Management

Date

Night works 7pm-5am

Wainui Rd between Hirini St and Crawford Rd

Full road closure with detours in place

Friday 3 – Saturday 4 May

Crew Rest Day

Sunday 5 May

Night Works 7pm-5am

Wainui Rd between Hirini St and Crawford Rd

Full road closure with detours in place

Monday 6 May – Thursday 9 May

Night works 7pm-5am

Wainui Rd between Crawford Rd and Kaiti Mall

Full road closure with detours in place

Friday 10 May – Monday 13 May

Night works 7pm-5am

Wainui Rd between Kaiti Mall and Matthews Rd

Full road closure with detours in place

Tuesday 14 May – Friday 17 May

Crew Rest Day

Saturday 18 May



Detour will be in place for next week’s SH51 southbound lane closure

A reminder to road users in Hawke’s Bay to factor in next week’s one lane overnight closure on State Highway 51 (SH51) when travelling.

From Monday (6 May) crews will be completing resurfacing work at the intersection of SH51 and Waitangi Road as part of our scheduled maintenance programme.

While this is not part of the current safety improvements, completing it at the same time minimises the potential for delays at a later date.

During this maintenance period, the southbound lane of SH51 between Awatoto Road and Farndon Road will be closed nightly between 8pm and 5am, starting on Monday 6 May and ending at 5am on Saturday 11 May.

Please allow for up to 20 minutes to be added to your journey or avoid this area during this time.

A sign posted detour will be available during the closure times 

These dates are subject to variables such as weather and may change at short notic


WORK NOTICE: Night closure SH2 HB Expressway between Meeanee Road and Links Road
1 May 2024
Kia ora,
The Transport Rebuild East Coast (TREC) team would like to advise you of road closure between Meeanee Road and Links Road scheduled for Sunday 19 May 2024, from 8pm to 5am Monday 20 May.
This resurfacing work is part of a scheduled maintenance ahead of winter.
Where SH2 HB Expressway – Between Meeanee Road and Links Road Full closure
When
Night works: Sunday 19 May (8pm) until Monday 20 May (5am).
Hours of work: 8pm-5am
There is no contingency plan for this work.
DETOUR:
Light vehicles:
Via Meeanee Road, Awatoto Road, right onto SH51, right onto Te Ara Kahikatea at Mangateretere, and left onto Pakowhai Road.
HPMV:
There is not suitable detour for HPMVs. Please plan around the full closure and travel a different time. Why? Resurfacing to improve the road surface






Tairāwhiti Gisborne/Hawke’s Bay

SH5 Napier to Taupō: Recovery alliance Transport Rebuild East Coast (TREC) continues to progress safety improvements, as well as repair, recovery and maintenance activities at multiple sites on SH5 between Eskdale and Waipunga. While this work takes place, there will be stop/go traffic management, traffic reduced to one lane, and temporary 30km/h and 50km/h speed limits from 7am to 6pm. Temporary speed restrictions will also remain in place at night in some areas. Overall, please expect cumulative delays of up to 40 minutes if travelling the whole of SH5 (Napier to Taupō).

GISBORNE

SH35 Night Time Closures for Asphalting

Please be advised that from Monday 29 April to Friday 31 May there will be night time closures on sites along SH35 from Stanley Road to Matthews Road as follows:

Stage 1 – SH35 Awapuni Road between Stanley Road and Grey Street roundabout – Road closure with detours - Monday 29 April to Thursday 02 May - 7pm to 5am

Stage 2 – SH35 Wainui Road between Hirini St and Matthews Road - Road closure with detours - Friday 03 May to Sunday 26 May - 7pm to 5am

Stage 3 – SH35 Customhouse St between The Cut Childers Road – Road closure with detours 6pm to 6am – Tuesday 28 May to Tuesday 4 June – 7pm to 5am

For Stages 1 and 3 the approved detour route for vehicles over 50T is via SH2 Makaraka, Back Ormond Road, Ormond road and The Esplanade – as shown below:

For Stage 2 the detour route for heavy vehicles coming from the north to the port is via Rutene Road, The Esplanade and Hirini St as per below.